    LOTO Map Process

    The LOTO(Lockout/Tagout)Map process is a visual procedure used to standardize equipment energy isolation operations, aiming to prevent safety accidents caused by unexpected equipment startup.


    1. Preparation phase

    • Clarify equipment information: Confirm the name, model, location, and associated systems (such as power supply, air supply, hydraulic source, etc.) of the equipment requiring LOTO operations

    • Identify energy sources: List all potential energy sources of the equipment (electrical, mechanical, hydraulic, pneumatic, thermal, etc.), and mark the location and type of each energy source.

    • Prepare tools: Prepare standard-compliant locks, tags, isolation devices (such as circuit breakers, valves, etc.), keys, warning signs, etc.

     

    2. Notify relevant personnel

    • Inform equipment operators, maintenance personnel, personnel in upstream and downstream processes in advance, specifying the time, scope, and precautions of the LOTO operation to ensure that irrelevant personnel stay away

      

    3. Stop equipment operation

    • Stop the equipment according to the normal shutdown procedure, ensuring that the equipment is completely stopped (e.g., the motor stops running, the conveyor belt is stationary, etc.).

     

    4. Isolate energy sources

    • Take physical isolation measures for the identified energy sources:

    • Electrical systems: Turn off the circuit breaker, unplug the power plug, and lock the circuit breaker.

    • Pneumatic/hydraulic systems: Close the air/hydraulic valve, release residual pressure in the pipeline, and then lock the valve.

    • Mechanical systems: Use clamps to fix moving parts (such as flywheels, sliders) to prevent accidental movement.

      

    5. Lockout and Tagout

    • On the control devices at each isolation point (such as circuit breakers, valves), hang tags with information like "Under maintenance, do not operate" and "In LOTO". Use personal dedicated locks (one lock per person, with keys kept by the individual) to lock them, ensuring they cannot be opened arbitrarily.


     

    6. Verify complete isolation of energy sources

    • Attempt to start the equipment (e.g., press the start button, operate the control lever) to confirm that the equipment shows no movement and the energy sources have been completely cut off.

    • For equipment with residual energy (such as capacitors, springs), take release measures (e.g., discharge, unload) and verify again.

     

    7. Perform the work(maintenance,etc.)

    • After confirming that the energy isolation is effective, start the scheduled work. Do not remove locks or tags without authorization during the work.

     

    8. Remove LOTO after work completion

    • After the work is completed, clean up the site, remove tools and obstacles, and ensure there are no safety hazards around the equipment.

    • Notify all personnel involved in LOTO, and after confirming that the isolation can be removed, each person removes their own locks and tags.

    • Restore energy sources in sequence (e.g., open valves, close circuit breakers) and check whether the equipment can operate normally.

      

    9. Documentation and feedback

    • Record information such as the time of the LOTO operation, personnel involved, types of energy sources, and isolation measures for traceability.

    • If problems are found during the operation (such as damaged locks, missed identification of energy sources), provide timely feedback and improve the process.


    The above process can be adjusted according to specific equipment and industry standards (such as OSHA standards). The core is to ensure 100% isolation of energy sources to prevent injuries caused by unexpected startup.


    Related Products
    Download
    PDF file download
    Video file download
    Previous

    Contact us

    400-881-6062

    Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.

    E-Mail: info@lh-safety.com

    Address: 581 Xiuchuan Road, Chuansha Town, Pudong New District, Shanghai

    (Greenland East Coast International Plaza-Room A 313)

    Copyright ? Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.  ICP19034341-1  Technical Support: lanjujing

    Online service

    Online message

  • Click to refresh
  • 主站蜘蛛池模板: 国产精品无码专区| 中文字幕乱码人妻无码久久免费| 国产麻豆剧果冻传媒星空视频| 香格里拉县| 国产第一页屁屁影院| 亚洲欧美色欲天天| 精品人妻网| 国产日韩精品欧美一区灰| 人妻少妇精品无码专区二区| 国产熟女高潮视频| 亚洲中文久久精品无码| 中文字幕av高清片| 91TS人妖另类精品系列| 日韩?人妻?无码?制服| 日本亚洲色大成网站www久久 | 一区二区三区内射美女毛片| 色综合中文| 国产熟妇久久777777| 五月丁香伊人| 精品久久久久久无码专区不卡| 超碰w| 久久国内视频| 久久久熟妇熟女| 一本色道久久综合亚洲精品| 久久精品国产一区二区三| 91久久夜色精品| 久久96热在精品国产高清| 欧美乱大交xxxxx潮喷l头像| 国产精品久久久亚洲 | 丝袜美腿一区二区三区| 国产精品美女| 日本精品成人| 亚洲vs无码秘?蜜桃少妇| 久久99久久99精品免视看动漫 | 国产超碰在线| 欧美黑人巨大精品videos| 欧美激情内射喷水高潮| 欧美性猛交xxxx富婆| 蜜桃av一区二区高潮久久精品 | 亚洲色大成网站www永久男同| 91你懂的|